1/22/2022

12/3/2021

12/3/2021

12/3/2021

12/3/2021

12/3/2021

11/16/2021

11/16/2021

11/9/2021
The first floor slap has been poured and the elevator shaft is being built. This process usually takes about 4 weeks and the framing will begin once completed.

11/9/2021

11/9/2021

10/12/21

10/12/21

9/14/2021

9/14/2021

9/7/2021

9/7/2021

9/7/2021

9/7/2021

8/31/2021

8/26/2021

8/26/2021

8/26/2021

8/26/2021